The Residential Street Rehabilitation Program is part of a 7 year pavement preservation cycle. It provides for the preservation of street pavement, the repair of damaged sidewalk, curb and gutter, and compliance with the Americans with Disabilities Act. The goal of the project is to prolong the Rancho Palos Verdes roadway life in the most cost-effective and efficient way.

Area 7 Residential Rehabilitation Project

 

Phase I of the Residential Street Rehabilitation Project will consist of removing and replacing sidewalk, ramps, driveway aprons, curb & gutter, crack routing and sealing, and AC dig-outs at various locations throughout Area 7. This work will be followed by asphalt surface treatment for all streets in area 7 in Phase II. Construction is expected to start in late summer 2017. If you are a resident in this area, you can expect to receive another letter with schedules as the information is available. 

Area 8 Residential Rehabilitation Project


The Area 8 Residential Street Rehabilitation Project will consist of removing and replacing sidewalk, ramps, driveway aprons, curb & gutter, crack routing and sealing, and AC dig-outs at various locations throughout Area 8 followed by asphalt surface treatment over all streets in this area. Area 8 is currently being designed and construction will be completed in fiscal year 18/19.