Roof sheathing and shear

Request roof sheathing (frame from top plates up) after all roof penetrations for plumbing and mechanical have been installed. (Inspect HVAC if applicable at this time.) Interior and exterior shear walls are to be inspected. Pre-assembled walls (strong walls, I-joists etc.) must be ICC listed. (All windows/sliders shall match plans for U-factor and egress.)