Framing

Interior and exterior walls should be constructed according to the type of material used as specified in the building code and approved set of plans. Request structural frame inspection after bracing; shear panels at walls, floors and roof; straps and hold-downs; fire blocking and all other framing and structural connections are in place. The framing inspection should be made after all electrical, plumbing, and mechanical rough-in has been inspected and all ducts, chimneys, hold-downs and shear walls are installed and framing is complete. (Building shall be dried-in prior to frame inspection.)

Show All Answers

1. Drywall/Shower Wallboard/Tile backer Inspection
2. Electrical
3. Electrical Service Panel
4. Exterior Underground Gas Line
5. Final Inspection
6. Rough Inspections
7. Framing
8. Foundation
9. Insulation Inspection
10. Interior gas lines/release
11. Lath/wrap Inspection
12. Plumbing/Mechanical
13. Roof sheathing and shear
14. Rough or precise grading
15. Shower pan (poured in place)
16. Special Inspections
17. Subfloor Insulation
18. Subsoil plumbing (or underfloor)
19. Temporary power pole
20. Underfloor and frame Inspection