Final Inspection

Request final inspection after construction is completed, including all grading, drainage and site work, and before the building is occupied. The building must be unlocked, or prior arrangements made for the inspector to access the building. All appliances, electrical fixtures, convenience outlets, switches and plates must be in place. The following is also required to receive a final on the building permit and a certificate of occupancy: (Provide a final HERS report if applicable.) Indicate the presence of required maintenance and operations manuals.

Show All Answers

1. Drywall/Shower Wallboard/Tile backer Inspection
2. Electrical
3. Electrical Service Panel
4. Exterior Underground Gas Line
5. Final Inspection
6. Rough Inspections
7. Framing
8. Foundation
9. Insulation Inspection
10. Interior gas lines/release
11. Lath/wrap Inspection
12. Plumbing/Mechanical
13. Roof sheathing and shear
14. Rough or precise grading
15. Shower pan (poured in place)
16. Special Inspections
17. Subfloor Insulation