- Home
- Departments
- Public Works
- Public Works Projects
Public Works Projects
-
Annual Sidewalk Repair Program Fiscal Year 2017 to 2018
Some of the main components of this project include the replacement of sidewalks, driveway aprons, and curb & gutter at various locations throughout the City.
-
Conestoga Trail Connection Project
The proposed improvements to the existing Conestoga trail between Sunnyside Ridge trail and Rolling Hills Estates include a construction of a multi-use trail, installation of a split rail wood fence, and metal beam guardrail and signage replacement.
-
Del Cerro / Park Place Traffic Documents
-
Palos Verdes Drive East Traffic & Equestrian Safety Improvements
-
Proposed Residential Development at Trump National
-
Palos Verdes Drive South Compatible Bike Safety Lanes
-
Palos Verdes Drive West Median Beautification Project
The Palos Verdes Drive West Median Beautification project is designed to improve the existing median landscaping and vegetation to sustainable landscaping which would require minimal maintenance.
-
Residential Streets Rehabilitation Project
Annual City street rehabilitation.
-
San Ramon Canyon / Storm Drain Project
The San Ramon Canyon / Storm Drain project is about addressing the landslide issue we have with the canyon.
-
Hawthorne Boulevard Median Beautification Project
This project consists of removing existing asphalt in the medians of Hawthorne Boulevard, between Crest Road and Palos Verdes Drive West, and installing new landscaping. The new landscaping will include bio-swales, Palos Verdes rock boulders, Black Mexican Beach Cobble and new drought-tolerant trees and shrubs.